Manufactur standard Single side shelving to Chile Importers

Short Description:

Suzhou Innovative Store Equipment Co., Ltd – Manufacturing of shelf systems for shop fittings ( shop shelving, retail shelving, display shelving, storage shelving, warehouse shelving ) was started in the 1989’s. Because of improvement in products quality and achievement of compatibility with another used shelf systems, production strongly expanded both in total output and quantity of manufactured components parts. We are willing to offer you a solution for any problem in the area of shopfitti...


Product Detail

Product Tags

Related Video

Feedback (2)

, , ,
Manufactur standard Single side shelving to Chile Importers Detail:

Suzhou Innovative Store Equipment Co., Ltd – Manufacturing of shelf systems for shop fittings ( shop shelving, retail shelving, display shelving, storage shelving, warehouse shelving ) was started in the 1989’s. Because of improvement in products quality and achievement of compatibility with another used shelf systems, production strongly expanded both in total output and quantity of manufactured components parts.

We are willing to offer you a solution for any problem in the area of shopfitting. We can offer both our standard products and products meeting your specific requirements.

Everything will be delivered in perfect shape and high quality.

 

Standard components

  • Wall units are an excellent way of maximizing wall space in your store or warehouse
  • Heavy duty slotted uprights and base supports make shelving unit stable
  • Base shelf made of rugged 0.8mm steel
  • Attractive powder coating finish
  • Back panel made of 1.2mm steel panel with standard 1” centered holes
  • Back panel made of 0.9mm steel panel with slot channel
  • Back panel made of 0.7mm steel flat panel
  • Back panel made of 6mm MDF with standard 1” center holes

 

Upright H 1210 – 3010mm
Base support 200mm | 270mm | 300mm | 370mm | 470mm | 570mm | 670mm | 770mm
Steel shelf W 665mm | 800mm | 1000mm | 1200mm | 1220mm | 1250mm | 1330mm

D 200mm | 270mm | 300mm | 370mm | 470mm | 570mm | 670mm | 770mm

Back panel W 665mm | 800mm | 1000mm | 1200mm | 1220mm | 1250mm | 1330mm

H 100mm | 200mm | 300mm | 400mm | 500mm

Colors Ral 9001 | Ral 9010 | Ral 7035 | Ral 9006
Load Capa. (kgs) 100kgs – - -  150kgs

 

Advantage

  • Easy set up with no tools required
  • Designed to conserve warehouse space
  • Industry’s most competitively priced units
  • Designed to get attention and give maximum display space

 

More option

Use our optional parts and accessories to create a unique point-of-purchase units.

Peg hooks | Wire slatwall shelves | Light box | Timber shelves | Side frame | Side mirror panel | Wire cage | Spreader bar

 

What we can offer:

  • System solution for any kind of shop centers
  • High flexibility
  • Simplicity and favourable price
  • High quality
  • Development and design according to requirements of clients

Product detail pictures:

Manufactur standard
 Single side shelving to Chile Importers detail pictures


Related Product Guide:
Wooden Kitchen Shelves Offer Beauty and Versatility
Flexible Financing With Mezzanine Debt

Manufactur standard Single side shelving to Chile Importers, The product will supply to all over the world, such as: , , ,


  • This Department of Interior film captures Boulder Dam — better known as Hoover Dam — in the midst of its construction. See how the Colorado River flowed before, and after, the construction of what was then the world’s tallest dam.

    SUMMARY
    Part 1 shows the Colorado River and the arid deserts of the Southwest. Bulldozers build a road to the proposed dam site. A train brings in supplies and materials made throughout the U.S. The dam site is surveyed. Shows Boulder City, Nev., including workmen’s dormitories, kitchen, and mess hall. Workers ride to the dam site in trucks and drill and blast out diversion tunnels. Power shovels clear debris. In part 2, diversion tunnels are blasted open and coffer dams are constructed. Bulldozers and trucks clear excavated material. Sand and gravel is brought in by train and is screened, washed, and graded. Concrete is mixed and is carried by truck and locomotive to the dam site. In part 3, concrete is poured into forms. Shows the interior of a tunnel, the intake towers, spillways, and penstock valves. Tubing is made at the dam site and is assembled by workmen. In part 4, penstock pipe sections are trucked from factory to the dam site and lowered into position by cable. Concrete is poured into coffer dams. President Roosevelt speaks at the dedication ceremonies. Shows flashes of spillways, transmission towers, and power lines, and an aerial view of Boulder Dam and Lake Meade.

    Boulder Dam, 1937

    Transcript (PDF): https://www.archives.gov/social-media/transcripts/transcript-boulder-dam-11722.pdf

    CREATED BY
    Department of the Interior. Division of Motion Pictures.

    ARC ID 11722
    LOCAL IDENTIFIER 48.91

    REPOSITORY:
    Motion Picture, Sound, and Video Records Section, Special Media Archives Services Division (NWCS-M), National Archives at College Park, 8601 Adelphi Road, College Park, MD, 20740-6001.

    For information about ordering reproductions of moving images held by the Motion Picture, Sound, and Video Records Section, visit: https://www.archives.gov/research/order/broadcast-quality-film-dc.html

    SUBJECTS
    Blasting
    Building
    Concrete
    Dams
    Earthmoving machinery
    Electric engineering
    Reservoirs
    Roads
    Surveying
    Roosevelt, Franklin D. (Franklin Delano), 1882-1945
    Department of the Interior. Bureau of Reclamation.(06/20/1923 -11/06/1979 ), Producer
    Boulder City (Clark county, Nevada)
    Colorado River

    MORE INFORMATION:
    More information is available in the National Archives online catalog:

    https://arcweb.archives.gov/arc/action/ExternalIdSearch?id=11722


    5 Stars By from -

    5 Stars By from -

    Related Products

    WhatsApp Online Chat !