Massive Selection for Medium duty hole shelf racking for Honduras Factories

Short Description:

Suzhou Innovative Store Equipment Co., Ltd. – the supplier of industrial warehouse shelving systems of the highest standard. Industrial shelving calls for high standards of stability and load bearing capacity and the optimum degree of safety. The warehouse racking provide is with speed and ease of assembly. The components parts can be straightforwardly assembled and are distinguished by the precision detailing of their cross members (with varying load bearing capacities) stretchers and shelve...


Product Detail

Product Tags

Related Video

Feedback (2)

, , ,
Massive Selection for Medium duty hole shelf racking for Honduras Factories Detail:

Suzhou Innovative Store Equipment Co., Ltd. – the supplier of industrial warehouse shelving systems of the highest standard. Industrial shelving calls for high standards of stability and load bearing capacity and the optimum degree of safety. The warehouse racking provide is with speed and ease of assembly. The components parts can be straightforwardly assembled and are distinguished by the precision detailing of their cross members (with varying load bearing capacities) stretchers and shelves.

Safety is a major feature of our industrial shelving systems. Indispensable safety accessories include end-brackets, back stops and collision guards. Environmental protection is closely associated with safety. Our powder coating contain no solvents, while the process materials we use are free of any aromatic or chlorinated hydrocarbons.

Standard components

  • Pallet racking make the warehouse neat & clean
  • Heavy duty capacity to make environment safety
  • Upright frame and beam is made of heavy material
  • Different types of beam and shelves is fit for different packaging

 

Upright frame H 2200 – 5000mmD 400mm – 1050mm
Upright section 40*55*2.0mm80*70*2.0mm90*70*2.0mm
Beam L 1200mm – 3000mm
Beam type CC BEAM | STEP BEAM | CHANNEL BEAM | TUBE BEAM
Colors White | Orange | Blue
Load Capa. (kgs) Above 2500kgs

 

Advantage

  • Designed to conserve warehouse and display space
  • Industry’s most competitively priced units
  • Designed to get attention and give maximum display space

 

More option

Use our optional parts and accessories to create a unique point-of-purchase units.

Storage wire cage | Corner guard | Column protector | Frame protector | Pallet stopper | Side wire mesh panel | Advertise top panel | Light box

 

What we can offer:

  • System solution for any kind of storage and warehouse
  • High flexibility
  • Simplicity and favourable price
  • High quality
  • Development and design according to requirements of clients

Product detail pictures:

Massive Selection for
 Medium duty hole shelf racking for Honduras Factories detail pictures


Related Product Guide:
Wooden Kitchen Shelves Offer Beauty and Versatility
Why Choose Us for CU Racking

Massive Selection for Medium duty hole shelf racking for Honduras Factories, The product will supply to all over the world, such as: , , ,


  • This Department of Interior film captures Boulder Dam — better known as Hoover Dam — in the midst of its construction. See how the Colorado River flowed before, and after, the construction of what was then the world’s tallest dam.

    SUMMARY
    Part 1 shows the Colorado River and the arid deserts of the Southwest. Bulldozers build a road to the proposed dam site. A train brings in supplies and materials made throughout the U.S. The dam site is surveyed. Shows Boulder City, Nev., including workmen’s dormitories, kitchen, and mess hall. Workers ride to the dam site in trucks and drill and blast out diversion tunnels. Power shovels clear debris. In part 2, diversion tunnels are blasted open and coffer dams are constructed. Bulldozers and trucks clear excavated material. Sand and gravel is brought in by train and is screened, washed, and graded. Concrete is mixed and is carried by truck and locomotive to the dam site. In part 3, concrete is poured into forms. Shows the interior of a tunnel, the intake towers, spillways, and penstock valves. Tubing is made at the dam site and is assembled by workmen. In part 4, penstock pipe sections are trucked from factory to the dam site and lowered into position by cable. Concrete is poured into coffer dams. President Roosevelt speaks at the dedication ceremonies. Shows flashes of spillways, transmission towers, and power lines, and an aerial view of Boulder Dam and Lake Meade.

    Boulder Dam, 1937

    Transcript (PDF): https://www.archives.gov/social-media/transcripts/transcript-boulder-dam-11722.pdf

    CREATED BY
    Department of the Interior. Division of Motion Pictures.

    ARC ID 11722
    LOCAL IDENTIFIER 48.91

    REPOSITORY:
    Motion Picture, Sound, and Video Records Section, Special Media Archives Services Division (NWCS-M), National Archives at College Park, 8601 Adelphi Road, College Park, MD, 20740-6001.

    For information about ordering reproductions of moving images held by the Motion Picture, Sound, and Video Records Section, visit: https://www.archives.gov/research/order/broadcast-quality-film-dc.html

    SUBJECTS
    Blasting
    Building
    Concrete
    Dams
    Earthmoving machinery
    Electric engineering
    Reservoirs
    Roads
    Surveying
    Roosevelt, Franklin D. (Franklin Delano), 1882-1945
    Department of the Interior. Bureau of Reclamation.(06/20/1923 -11/06/1979 ), Producer
    Boulder City (Clark county, Nevada)
    Colorado River

    MORE INFORMATION:
    More information is available in the National Archives online catalog:

    https://arcweb.archives.gov/arc/action/ExternalIdSearch?id=11722


    5 Stars By from -

    5 Stars By from -

    Related Products

    WhatsApp Online Chat !